Magnum-venus-plastech PATRIOT 1:1 ADHESIVE SYSTEM Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Equipamento Magnum-venus-plastech PATRIOT 1:1 ADHESIVE SYSTEM. Magnum Venus Plastech PATRIOT 1:1 ADHESIVE SYSTEM User Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir

Resumo do Conteúdo

Página 1 - Operations Manual

Rev. 09/2012 PATRIOT 1:1 ADHESIVE SYSTEM Operations Manual

Página 2 - MVP Plastech UK

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 10 When all three elements are present, the result can be an extremely violent ex

Página 3 - Table of Contents

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 11 G. Adequate ventilation (as covered in OSHA Section 1910.94 and NFPA No.91) is

Página 4

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 12 2.7 Toxicity of Chemicals A. Magnum Venus Plastech recommends that you consult

Página 5

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 13 3.0 Equipment Safety WARNING Magnum Venus Plastech suggests that personal safe

Página 6 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 14 3.2 Grounding Grounding an object means providing an adequate path for the flo

Página 7 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 15 Introduction: MANUALS GOAL: To create a better knowledge and understanding o

Página 8 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 16 Unit Requirements & Assembly: Please make sure all appropriate personal

Página 9 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 17 Hose Connections: 1. Attach Yellow Flush Tube (solvent to the gun) to the ou

Página 10 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 18 Gun Connections: Pre Startup Instructions:

Página 11 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 19 Priming the Unit: Priming of Unit Air and Solvent: 1. Close the main inlet

Página 12 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 2 CORPORATE HEADQUARTERS and MANUFACTURING 11692 56th Court * Clearwa

Página 13 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 20 5. Close the Pail Lift valve located below the air lift regulator (see figure

Página 14 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 21 Priming the Adhesive and Activator: 1. Fill the Adhesive pump and Activator

Página 15 - Introduction:

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 22 7. To lower barrel piston down into the pail, move the ram up/down handle to

Página 16 - Air Requirements:

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 23 14. Secure leaks, if any. 15. Allow Pump to continue pumping until there is

Página 17 - Hose Connections:

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 24 Mixing & Dispensing: 1. Attach static mixer to gun, apply lubricant to

Página 18 - Pre Startup Instructions:

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 25 End of Week Flushing, Cleaning and Shutdown: 1. When finished with dispensi

Página 19 - Priming the Unit:

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 26 Changing Empty Pails: 1. Turn Air Lift control lever to “neutral” position

Página 20 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 27 4. Turn Air Lift control lever to “up” position (see figure 20). Figur

Página 21 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 28 Daily Start-up & Shut-Down: • DAILY STARTUP 1. Check and refill all c

Página 22

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 29 Testing & Adjusting: Pour Testing: Pull the trigger and start pouring ma

Página 23 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 3 Table of Contents SECTION: Page TERMS & CONDITIONS

Página 24 - Mixing & Dispensing:

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 30 Result 1: Material delivered on the activator pump down-stroke (from the top o

Página 25 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 31 Result 3: Material delivered at the top and bottom of the stroke

Página 26 - Changing Empty Pails:

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 32 Fluid Section Manual: The Patriot 1:1 Adhesive system comes standard with tw

Página 27 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 33 Powerhead Manual: The Patriot 1:1 Adhesive system comes standard with the Pa

Página 28 - • DAILY SHUT-DOWN

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 34 Dispense Gun Manual: The Patriot 1:1 Adhesive system comes standard with the

Página 29 - Testing & Adjusting:

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 35 Part Drawings: PAT-CCP-LS-0590-SS CHOP CHECK FLUID SECTION ASSEMBLY PAT-RA

Página 30 - T T T

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 36

Página 31

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 37

Página 32 - Fluid Section Manual:

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 38

Página 33 - Powerhead Manual:

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 39

Página 34 - Dispense Gun Manual:

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 4 Terms & Conditions of Sale: • Customs duties, import and export licenses

Página 35 - Part Drawings:

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 40

Página 36 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 41

Página 37 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 42

Página 38 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 43

Página 39 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 44

Página 40 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 45

Página 41 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 46

Página 42 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 47

Página 43 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 48

Página 44 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 49

Página 45 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 5 against the Seller in respect of the goods, the liability of the Seller shall b

Página 46 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 50 Revision Information: Rev: 09/2012 Updated the manual format and Address. W

Página 47 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 51 MAGNUM VENUS PLASTECH CORPORATE HEADQUARTERS and MANUFACTURING 11692 56

Página 48 - Rev. 09/2012 Page

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 6 SAFETY & WARNING INFORMATION: OPERATING YOUR POLYESTER SYSTEM SAFELY 1. Int

Página 49

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 7 Type of Fire Extinguishing equipment recommended: Fire Extinguisher – code ABC,

Página 50 - Revision Information:

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 8 2.2 Catalyst (Methyl Ethyl Ketone Peroxide) MEKP is among the more hazardous ma

Página 51 - MAGNUM VENUS PLASTECH

Patriot 1:1 Adhesive System Operations Manual Rev. 09/2012 Page | 9 C. Prevent contamination of MEKP with other materials, including polyester over

Comentários a estes Manuais

Sem comentários