Putty Unit Operations Manual Rev. 07/2012 Page | 10 When all three elements are present, the result can be an extremely violent explosion. The reac
Putty Unit Operations Manual Rev. 07/2012 Page | 11 G. Adequate ventilation (as covered in OSHA Section 1910.94 and NFPA No.91) is important whereve
Putty Unit Operations Manual Rev. 07/2012 Page | 12 2.7 Toxicity of Chemicals A. Magnum Venus Plastech recommends that you consult OSHA Sections 191
Putty Unit Operations Manual Rev. 07/2012 Page | 13 3.0 Equipment Safety WARNING Magnum Venus Plastech suggests that personal safety equipment such
Putty Unit Operations Manual Rev. 07/2012 Page | 14 3.2 Grounding Grounding an object means providing an adequate path for the flow of the electrica
Putty Unit Operations Manual Rev. 07/2012 Page | 15 Introduction: Please make sure all appropriate personal protective equipment is used before st
Putty Unit Operations Manual Rev. 07/2012 Page | 16 Assemble the unit: 1. Swing up and attach the Catalyst Manifold and Bracket to the support bar.
Putty Unit Operations Manual Rev. 07/2012 Page | 17 9. Attach ¼ inch air hose from regulator on manifold to flush tank or flush pump (see figures
Putty Unit Operations Manual Rev. 07/2012 Page | 18 Priming Solvent: 1. Close the main inlet air valves on the main air manifolds (see Fig. 12)
Putty Unit Operations Manual Rev. 07/2012 Page | 19 9. Open the Ball Valve and slowly turn up regulator pressure to Flush Tank or solvent pump, if
Putty Unit Operations Manual Rev. 07/2012 Page | 2 CORPORATE HEADQUARTERS and MANUFACTURING 11692 56th Court * Clearwater, FL 33760 *
Putty Unit Operations Manual Rev. 07/2012 Page | 20 Priming Putty Pump: 1. Fill solvent cups with throat seal liquid (see Fig. 16) Fig. 16
Putty Unit Operations Manual Rev. 07/2012 Page | 21 5. Ram should begin to lift, check for hoses catching or kinking 6. Allow ram to go to full “
Putty Unit Operations Manual Rev. 07/2012 Page | 22 15. Position dispensing block / gun over an appropriate waste container to allow priming of li
Putty Unit Operations Manual Rev. 07/2012 Page | 23 Priming Catalyst System: PRIMING CATALYST TO GUN (POUR & SPRAY) 1. Do not use quick pin
Putty Unit Operations Manual Rev. 07/2012 Page | 24 Mixing and Dispensing: 1. Attach Static Mixer assembly to outlet on dispensing head / gun, a
Putty Unit Operations Manual Rev. 07/2012 Page | 25 7. Pour: Install mixing tube (05260) onto gun head, making sure there is a seal (02029-1) betw
Putty Unit Operations Manual Rev. 07/2012 Page | 26 Flushing, Cleaning & Shutdown: When finished with dispensing, it is necessary to flush an
Putty Unit Operations Manual Rev. 07/2012 Page | 27 Changing Empty Drum: 1. Position drum catch by sliding over base of drum rim (see Fig. 47)
Putty Unit Operations Manual Rev. 07/2012 Page | 28 5. Turn Ram control lever to “up” position Fig. 50 6. Adjust pressure regulator ma
Putty Unit Operations Manual Rev. 07/2012 Page | 29 Adjusting Drum Low Limit: 1. To set the low level limit loosen the bolt holding the shaft
Putty Unit Operations Manual Rev. 07/2012 Page | 3 Table of Contents SECTION: Page TERMS & CONDITIONS OF SALE 4 SAFETY
Putty Unit Operations Manual Rev. 07/2012 Page | 30 Daily Start-up & Shut-down: DAILY STARTUP 1. Check and refill all components and material
Putty Unit Operations Manual Rev. 07/2012 Page | 31 Mix Meter / Pour Test: The same process and results that are used for testing the spray can be
Putty Unit Operations Manual Rev. 07/2012 Page | 32 Test 2 Result 2: Material delivered at the top and bottom of the stroke is hot (cur
Putty Unit Operations Manual Rev. 07/2012 Page | 33 Result 4: Material delivered at the top and bottom of the stroke is hot (curing very rapidly).
Putty Unit Operations Manual Rev. 07/2012 Page | 34 Dispense Head / Gun: Spray Units: The Putty Unit uses the Classic Pro Gun Assembly for Spray
Putty Unit Operations Manual Rev. 07/2012 Page | 35 Fluid Section Repair: The Putty Unit uses the CCPLS-1000 Chop Check Fluid Section Assembly – f
Putty Unit Operations Manual Rev. 07/2012 Page | 36 Powerhead Information: The Putty Unit uses the 7” Powerslide Powerhead – for detailed instruc
Putty Unit Operations Manual Rev. 07/2012 Page | 37 4.01.41.2 1.8 2.52.2 2.8 3.63.2 4.3 Metering Pump Manual: The Putty Unit uses the PHPC-7200 M
Putty Unit Operations Manual Rev. 07/2012 Page | 38 Parts Drawings: APD-1010 RAM LOWER LIMIT APD-1000 FRAME WORK RAM CYLINDER ASSY. MA-34
Putty Unit Operations Manual Rev. 07/2012 Page | 39 MAGNUM VENUS PRODUCTSASSY - FRAME WORK RAM CYL.APD-1010REV - 09/08/05 BT2EXISTING RAMP
Putty Unit Operations Manual Rev. 07/2012 Page | 4 Terms & Conditions of Sale: • Customs duties, import and export licenses and certificates,
Putty Unit Operations Manual Rev. 07/2012 Page | 40 ASSY - FRAME WORK RAM CYL. APD-1010ITEMPART NO. QTY DESCRIPTIONPARTS LIST6 09068 1 VALVE BRA
Putty Unit Operations Manual Rev. 07/2012 Page | 41
Putty Unit Operations Manual Rev. 07/2012 Page | 42
Putty Unit Operations Manual Rev. 07/2012 Page | 43
Putty Unit Operations Manual Rev. 07/2012 Page | 44
Putty Unit Operations Manual Rev. 07/2012 Page | 45
Putty Unit Operations Manual Rev. 07/2012 Page | 46
Putty Unit Operations Manual Rev. 07/2012 Page | 47 Revision Information: Revision: Description: Rev. 08/2011 Created this manual Rev: 07
Putty Unit Operations Manual Rev. 07/2012 Page | 48 MAGNUM VENUS PLASTECH CORPORATE HEADQUARTERS and MANUFACTURING 11692 56th Court * Clearwa
Putty Unit Operations Manual Rev. 07/2012 Page | 5 against the Seller in respect of the goods, the liability of the Seller shall be limited to the v
Putty Unit Operations Manual Rev. 07/2012 Page | 6 SAFETY & WARNING INFORMATION: OPERATING YOUR POLYESTER SYSTEM SAFELY 1. Introduction Any tool
Putty Unit Operations Manual Rev. 07/2012 Page | 7 Type of Fire Extinguishing equipment recommended: Fire Extinguisher – code ABC, rating number 4a6
Putty Unit Operations Manual Rev. 07/2012 Page | 8 2.2 Catalyst (Methyl Ethyl Ketone Peroxide) MEKP is among the more hazardous materials found in c
Putty Unit Operations Manual Rev. 07/2012 Page | 9 C. Prevent contamination of MEKP with other materials, including polyester over spray and sanding