PATRIOT CHOP CHECK FLUID SECTION MANUAL PAT-CCP-LS-0590 & PAT-CCP-LS-0590-SS Rev. 02/2012
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 10 A. The reaction is unpredictable. Prior use of an HHC solvent without incide
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 11 2.4 Catalyst Diluents Magnum Venus Plastech spray-up and gel-coat systems cu
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 12 2.8 Treatment of Chemical Injuries Great care should be used in handling the
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 13 3.1 Emergency Stop Procedures The following steps should be followed in orde
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 14 3.2 Grounding Grounding an object means providing an adequate path for the f
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 15 Introduction: This manual, the Patriot Chop Check Manual, provides informati
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 16 Tools required: • Red Grease (6706-2-1 1 oz) (6706-2-16 16 oz) (6706-2-32
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 17 Fluid Section Removal: 1. Remove the Ram and Pump from the material. 2
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 18 This page was left blank intentionally.
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 19 Fluid Section Disassembly: NOTE: As you disassemble, lay the parts out on a
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 2 CORPORATE HEADQUARTERS and MANUFACTURING 11692 56th Court * Cl
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 20 15. Remove the Packing Nut (PAT-CCP-0504) from the top of the Outlet Body.
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 21 Fluid Section Assembly: NOTE: The procedures for assembly of the Stainless
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 22 9. Thread the Packing Nut (PAT-CCP-0504) into the top of the Outlet Body.
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 23 16. Install the Valve Stop (PAT-CCP-0530) over the Priming Rod into the en
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 24 24. Install the Priming Seal (PAT-CCP-0524) onto the Priming Piston (PAT-C
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 25 FLUID SECTION INFORMATION: Power Head PAT-CCP-LS-0590 1:1 PAT-CCP-LS-0590-
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 26 This page was left blank intentionally.
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 27 Parts Drawings: PAT-CCP-LS-0590 PATRIOT CHOP CHECK FLUID SECTION PAT-
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 28 This page was left blank intentionally.
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 29
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 3 Table of Contents: SECTION: Page TERMS & COND
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 30
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 31
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 32
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 33
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 34
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 35
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 36
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 37
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 38
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 39
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 4 Terms & Conditions of Sale: • Customs duties, import and export license
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 40 This page was left blank intentionally.
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 41 Revision Information: Revision Description Rev. 11/2008 Added revision
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 42 MAGNUM VENUS PLASTECH CORPORATE HEADQUARTERS and MANUFACTURING 11692
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 5 • Many factors beyond Seller’s control contribute to the success of Buyer’s
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 6 SAFETY & WARNING INFORMATION: OPERATING YOUR POLYESTER SYSTEM SAFELY 1. I
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 7 Extinguishing Media – Foam, Carbon Dioxide, Dry Chemical, Water Fog. Copies o
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 8 2.2 Catalyst (Methyl Ethyl Ketone Peroxide) MEKP is among the more hazardous
PAT-CCP-LS-0590 Chop Check Fluid Section Manual Rev. 02/2012 Page | 9 D. Never add MEKP to anything that is hot, since explosive decomposition may
Comentários a estes Manuais